Evergreen Plan

Background:

A sub-committee of the  COAA Safety Committee  has developed tools for conducting Field Level Risk Assessments. These tools were  introduced at the May 13 1998 Best Practices Workshop held in Edmonton. Training materials  are available to assist companies  implement the use of these tools.

It is anticipated that actual use of these tools will reveal areas where they can be  improved or enhanced. This evergreen process is proposed to ensure that opportunities to  improve  the Field Level Risk Assessment tools are not lost. The Field Level Risk  Assessment Process must be as practical and efficient as possible, if workers are expected  to find value in it.

Everyone is encouraged to contact the COAA office with this their suggested  improvements.

Plan:

The evergreen process is really a cyclic  continuous improvement process.

An Ad Hoc team from the COAA Safety Committee will manage the process and provide  periodic progress reports.

 

Back to Field Level Risk Assessment

© Copyright 2006 COAA | Terms Of Use | Design by Primal Tribe | Login |